|
Ring Set, Sea-Doo 657/X
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||
|
1993 Sea-Doo XP Rings
1994 Sea-Doo GTX Rings 1994 Sea-Doo SPX Rings 1994 Sea-Doo XP Rings 1995 Sea-Doo GTX Rings 1995 Sea-Doo SPX Rings Piston to Cylinder Clearance:
The piston size plus the clearance equals the final bore size. For the recommended clearances by make and model, see Table 1. The cylinder first should be bored to within 0.002 of the final bore size. The remaining 0.002 should be removed with a 400 grit cylinder hone. The honing process should be controlled such as to leave a 45 degree crosshatch pattern on the cylinder wall. Port Chamfering: Once the cylinder is honed to the final size, all of the ports in the cylinder wall should be chamfered with a file or chamfer tool. The chamfered edge should be cut at approximately a 30 degree angle around the entire port. The cylinder should then be honed with a 400 grit flex hone to apply a uniform finish and to re-establish the 45 degree cross-hatch pattern. Cylinder Cleaning Process: Clean cylinders in warm soapy water using a firm plastic brush (such as a tooth brush), then dry, and immediately lubricate with 2-stroke oil. Honing grit tends to reside in the crosshatch and must be scrubbed out. An extremely clean cylinder free of grit is critical in order to avoid drag marks and other damage to the cylinder wall after assembly. Setting the Ring Cap: Place the piston ring in the cylinder. Use the piston to push the ring approximately 5mm from the top of the cylinder in order to square the ring in the cylinder. Use a feeler gauge to measure the gap between the ends of the ring. If the gap is too small, one end of the ring must be filed. Re-install the ring and measure again to confirm the final dimension. Recommended ring gap clearances are shown in Table 2. Piston Installation: Install the base gasket (we recommend Threebond 1211 as a gasket treatment). Lubricate the wrist pin bearing with 2-stroke oil and install the piston on the connecting rod. The designation mark on the piston crown points in the direction as shown in Table 3. Install the c-clips with the open end in either the 6 or 12 oclock position. Install the rings onto the piston. Using your hands or a ring compressor, collapse the rings into the ring grooves and install the cylinder. Torque cylinder to proper torque specifications.
|
||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||||